CQPA Gladstone Marina Upgrade

tfaMarinasCQPA

Project Description

This project included the removal of 2 x 10 KL underground diesel tanks and replacing them with a 70 KL double walled fibre glass tank. The facility was upgraded with electronic tank and line leak detection including tank level monitoring. New submersible pumps were installed in the tank turrets to increase the flow rate to the wharf. The new pumps and piping were required to meet future expansion plans.

Phase II was designed which entailed the removal of the existing single wall galvanise pipe and replacing it with double wall UPP or equivalent piping.

The project was completed in the shortest possible time to avoid inconvenience to the marina clients.

Timing

Construction was completed in November 2005.

TfA Contribution

TfA provided detailed design, tender documents, tender evaluation, contract documentation and construction site supervision. This included hydraulic analysis, HAZOP leadership, on site construction inspections during construction activities, commissioning, operational procedures and maintenance manuals.

 

 

 

Back to top

© Tam Faragher & Associates Pty Ltd. Site designed by Fugu Design.
graphic

TfA Projects

Bulk Fuel / Oil Facilities

Commercial Projects

Ethanol Projects

Marina Projects

Mining Projects

Schools Projects

Service Stations and Truck Stops