close
Search

The Clermont Mine project included a 350kL diesel tank farm with heavy vehicle and light vehicle refueling facilities and a lubricants tank farm with 6 grades, grease and waste oil evacuation reticulated throughout the workshops.

A fine filtration system was installed on all lubricant grades and tank gauging.