TfA completed a major upgrade of the Shell Pinkenba bitumen plant including a new 10ML bitumen storage tank, wharfline, heat exchangers, hot oil heater and connections to the road tanker loading bay.
Project Scope
- New Insulated 10ML Bitumen Tank with Internal Heating Coils
- Four new Heat Exchangers
- New Gantry Pumps
- Radar Tank Gauging
- New 500m x 250NB Dock line
|
- New tank bund
- New Driveway Pavements
- New Main Switchboard
- Extension to fire water hydrant ring main
- Fire System hydraulic study
|
TfA Role
- Project Management
- Facilitation of Approvals
- Functional Specification
- Cost Estimate
- Detailed Design
- Equipment & Instrument Data Sheets
- PLC Logic
- Construction management
- Full Time Construction Supervision
- Commissioning
|
- P&ID’s
- Hydraulic pipe flow modelling
- Pump specification and sizing
- Piping Isometrics
- Bulk Earthworks
- Civil and Structural design
- Electrical & Instrumentation design
- Hazardous Area Drawings
- Operating Procedures
|