TFA designed a brand new oil terminal incorporating the restoration of two old existing and rusting 26ML Orica naphtha storage tanks on Kooragang Island.

The project included a new 1500m dock line to three separate wharves with pigging stations, wharf manifold valve automation and a pipeline depressurization system with noise attenuation and mist removal was designed which exceeded the clients expectations.

TfA’s Role:

  • Project Management
  • Facilitation of approvals
  • Functional Specification
  • Cost estimate
  • Detailed design
  • Construction management support
  • P&IDs
  • Hydraulic pipe flow modelling
  • Pump specification and sizing
  • Piping Isometrics
  • Bulk earthworks
  • Civil and structural design
  • Mechanical design